I walked outside in a light drizzle today to check on the figs. They are starting to ripen! The tree with the early, smaller figs is loaded. The other fig tree has larger, fat green figs that will ripen later.
I’m keeping this first picking to pig out on fresh. They are superb!
I ordered fabric for the small bathroom last night. Am going crazy trying to pick out paint colors.
But there’s a lot of prep work before I start since I need to replace part of the subfloor under the toilet, install a new toilet and lavatory and replace the flooring. I’ve decided to keep the existing countertop. It’s dated, but still sound and the color will work with my fabric.
I’m feeling a little under the weather, so might take a while to actually get busy on the project. But the planning is always the toughest part for me, anyway, and I think I have most of what I want to do figured out.